| October 8, 2005 |
Here is a view of the finish roof from across the creek. |
![]() |
| Doorway
to the Utility Room with light fixture. But we got to do something with the ugly concrete retaining wall. |
![]() |
| Few from
the street. All that needs to be done is pouring concrete walkways and hanging the shutters |
![]() |
| Eric and
Betty inspect the entry. The pocket doors (on the right) have finally been installed. |
![]() |
| Master bathroom shower door. |
![]() |
| Hallway looking onto the stairwell. |
![]() |
| Louvered doors for eventual washing machine and dryer. |
![]() |
| Mr
Plaster finally finishes the job and begins to disassemble the scaffolding. |
![]() |
| Meanwhile, the Palmers prepare four pouring concrete. |
![]() |
| Front door with doorbell and luminous street numbers. |
![]() |
|
Somebody has recommended that we name the cabin: Chateau Puits d'Argent, whatever that means. Personally, we still like calling the place what we've been calling it for over 40 years: The cabin. Two baboons have been spotted hanging around the cabin. Animal Control must have missed them. My plan is to train them to stand guard by the front door. |
| Return to Rebuilding |