| August 26, 2005 |
Floor done on the landings. Baseboard placed on the stairs. All that needs to be done now is varnish the steps and paint the railing. |
![]() |
| The
study is ready for the painter. The the room is done. |
![]() |
| Down in
Mentone, Eric stands next to the caps for the chimneys which are fabricated and ready to be installed (once the plasterer decides to finish the stucco). |
![]() |
| Here we go again. The gang wonders down Pineridge. |
![]() |
| Kevin and Ann work on the exterior with a little help from their friends |
![]() |
| Cool view of our place from Ann and Kevin's second floor. |
![]() |
| Here again is a proposed "Baboon Crossing" sign |
| Return to Rebuilding |