August 26, 2005

Floor done on the landings.  Baseboard placed on the stairs.
All that needs to be done now is varnish the steps and
paint the railing.

 
The study is ready for the painter.  The the room
is done.


Down in Mentone, Eric stands next to the caps for the chimneys which
are fabricated and ready to be installed (once the plasterer decides to
finish the stucco).

 
Here we go again.  The gang wonders down Pineridge.

 
Kevin and Ann work on the exterior with a little help from their friends

 
Cool view of our place from Ann and Kevin's second floor.

 
 
 

 
Here again is a proposed "Baboon Crossing" sign
 
 
Return to Rebuilding